When you work them hard they get dirty

Hose reels on route to site
Hose reels en route to a Pipeline hydro test. The skilled technicians mobilized hose reels from Fort McMurray last night as project requirements changed and increased the total length of hose. The original scope changed, so local regulations and codes must be met and environmental consideration to line routing must be prioritized.
The load arrived well in advance of project schedule requirements and installed easily in a remote area of Alberta to water transfer to pipe line pressure test. NCS is proud to be Alberta Strong.