Twinned 10" system up and running

NCS Fluid Handling Systems Sanitary Bypass system setup
The existing infrastructure in most major cities is getting old and in need of repair or replacement. To maintain and upgrade the existing infrastructure construction companies require sewage bypass. Typically bypass pumping will occur because of new construction, lift station repair, re-line existing pipelines, lift station malfunctioning, broken gravity line, force main rupture, tie-ins or a combination of these factors.
The NCS Engineering and Design team are specialists in the design of Sanitary Bypass systems also know as sewer bypass systems. The team at NCS Fluid Handling Systems supports projects across Canada for all municipal and construction clients and provide with operational comfort that the system will operate in support of their project demands and that the team can supply calculations to support designed flow conditions and provide engineered solutions should conditions change.
This particular NCS fluid Handing Systems client required a sewer bypass on culvert replacement in BC lower mainland.